used for pipeline installations under rivers or crossings underneath
        
        
          roads and railway embankments etc, i.e. wherever a pipeline has to
        
        
        
          k.
        
        
        
        
          iver Borrida near
        
        
          the city of Mombaldone in the province of Asti, Italy. The pipeline
        
        
          ran above ground mounted to a railway bridge. In order to protect
        
        
          it from flooding and flushing, it was relocated underground using
        
        
          an HDD rig type PD 80/50 RP.
        
        
          The special challenge here was the varying ground conditions
        
        
          along the bore path. The 8 in. pipe was successfully installed
        
        
          under the Bormida river within only six days. Covering a drilling
        
        
          length of 328.17 m and a height difference between entry and exit
        
        
          point of 11.5 m, the project was realised quickly and without any
        
        
          complications, though the varying geology on site represented a
        
        
          major challenge for the equipment.
        
        
          Key facts:
        
        
          )
        
        
          Technique: horizontal directional drilling.
        
        
          )
        
        
          Type of bore: crossing underneath the river Borrida/Italy.
        
        
          )
        
        
          Equipment: HDD rig PD 80/50 RP.
        
        
          )
        
        
          Pipe: oil pipe PE 8 in. (204 mm).
        
        
          )
        
        
          Soil type: sand and silt, marly rock (over 75% of the total bore
        
        
          length).
        
        
          )
        
        
          Bore length: 328.17 m.
        
        
          )
        
        
          Entry angle: 12°.
        
        
          )
        
        
          Exit angle: 12°.
        
        
          )
        
        
          Straight entry length: 4263 m.
        
        
          )
        
        
          Height difference: 11.5 m.
        
        
          )
        
        
          Contractor: LMR Drilling GmbH.
        
        
          )
        
        
          Remarks: installation speed of 20 - 25 min. per drill rod at 9.5 m.
        
        
          
            Gas pipeline through the Uzbek sand
          
        
        
          In the Central Asian state of Uzbekistan, near the industrial city
        
        
          of Nukus, the crossing of the country’s longest river has been
        
        
          successfully realised. Thanks to the horizontal directional drilling
        
        
          rig type PD 250/90 RP designed as trailer version and the team of
        
        
          experts onsite, the installation works were completed quickly and
        
        
          easily. Over a length of 1000 m the steel product pipe of diameter
        
        
          1.042 mm was pulled in under the Armudaja river. The drilling rig
        
        
          had to withstand the most difficult conditions prevailing in the
        
        
          Uzbek steppe region, such as frequent desert storms and extreme
        
        
          temperatures. In the fine, sandy, demanding soil the drilling rig
        
        
          impressively proved its exceptional performance. After only three
        
        
          weeks from the start of the project, the successful completion of
        
        
          the gas pipe installation was reported to the highly pleased client
        
        
          company, Neftegazmontajz.
        
        
          Key facts:
        
        
          )
        
        
          Technique: horizontal directional drilling.
        
        
          )
        
        
          Type of bore: crossing underneath the river Armudaja/
        
        
          Uzbekistan.
        
        
          )
        
        
          Equipment: trailer-based PD drill rig with 250 t pullback
        
        
          force and mixing and recycling unit with a flow capacity of
        
        
          2.500 l/min.
        
        
          )
        
        
          New pipe: gas pipe, steel Ø 1042 mm.
        
        
          )
        
        
          Soil type: fine sand.
        
        
          )
        
        
          Bore length: 1000 m.
        
        
          )
        
        
          Client: Neftegazmontajz.
        
        
          )
        
        
          Contractor: PRIME Drilling GmbH.
        
        
          )
        
        
          Remarks: subsequently a parallel bore of the same dimensions
        
        
          was executed within 2.5 weeks.
        
        
          
            Hard rock HDD
          
        
        
          Modern HDD rigs can be equipped with special rock drilling tools
        
        
          to be used for pipeline installations in mountaineous regions. Even
        
        
          under very rough and rigid topographic and geologic conditions
        
        
          and circumstances, successful and even excellent HDD bores are
        
        
          possible.
        
        
          In some critical hillsides that often require a renewal of pipes
        
        
          with flexible plastic pipelines, due to an amount of swellable
        
        
          clay minerals in the soil, trenchless construction offers additional
        
        
          advantages that can have moderating and stabilising effects on the
        
        
          slopes.
        
        
          
            Gas pipeline through a ravine
          
        
        
          In June 2012 a rockslide with a volume of  1000 m
        
        
          3
        
        
          occured in the
        
        
          Gastein ravine near Salzburg in Austria, which hit a roadway and
        
        
          ripped off the downhill support wall to the Gastein mountain
        
        
          Figure 3.
        
        
          The steel pipe Ø 1042 mm which was installed over
        
        
          more than 1000 m length.
        
        
          Figure 2.
        
        
          The red line indicates the bore path underneath the
        
        
          Borrida river.
        
        
          108
        
        
          
            World Pipelines
          
        
        
          /
        
        
          JUNE 2015