techniques, carried out three road crossings using the dynamic ramming method with their
        
        
          GRUNDORAM Aopllo providing an impact energy 40 500 Nm.
        
        
          Contrary to the open trench steel pipes, which are surrounded by PE (Ø 1420 x 22.7 mm),
        
        
          glass-fibre coated steel pipes were applied for the road crossings. Three pipe strings each
        
        
          with a length of 18 m were welded together, an initial pressure test was carried out and the
        
        
          pipe ramming process was started. All three installations were carried out in three successive
        
        
          working days, as the working sequence was co-ordinated in an exemplary manner and despite
        
        
          the multilingual team-work (Italian, German and Dutch) carried out in a routine manner.
        
        
          Key facts:
        
        
          )
        
        
          Technique: dynamic steel pipe ramming.
        
        
          )
        
        
          Type of bore: road crossing for NEL pipeline Greifswald to Bremen/Germany.
        
        
          )
        
        
          Equipment:GRUNDORAM Apollo.
        
        
          )
        
        
          New pipes: protection pipe ND 355 mm, gas pipe ND 225 mm.
        
        
          )
        
        
          Installation lengths: 34 m in Perdöhl, 40 m in Albertinenhof, 44 m in Schwartow.
        
        
          )
        
        
          Soil type: compact, sandy soil.
        
        
          )
        
        
          Ramming speed: 40 m/2.5 hr.
        
        
          )
        
        
          Clients: WINGAS, E.O.N. Ruhrgas, GASUNIE.
        
        
          )
        
        
          Main contractor: Bonatti S.p.A. Parma/Italy (for two 60 km sections).
        
        
          )
        
        
          Subcontractor: DALCAI Horizontale Wegboringen B.V.
        
        
          In addition to installing steel pipes, ramming machines can be applied for the so-called
        
        
          HDD-assist techniques, which help to avoid costly situations when problems arise on a HDD
        
        
          project. These techniques have been used to successfully remove stuck drill stems, assist
        
        
          directional drill rigs during difficult pullbacks, free immobilised product pipes and even salvage
        
        
          failed bores by removing stuck pipe from the ground.
        
        
          HDD assist and rescue techniques include:
        
        
          )
        
        
          Conductor barrel: installation of casing pipes for HDD crossings.
        
        
          )
        
        
          Pull back assist: overcoming hydrolock.
        
        
          )
        
        
          Drill rod recovery: loosening of jammed HDD drill rod.
        
        
          )
        
        
          Bore salvage: rescuing/removing jammed product pipes.
        
        
          Static pipe bursting in pipeline rehabilitation
        
        
          Leaking oil, gas or water pressure pipelines force utility companies to decide whether to repair,
        
        
          renovate or replace the defective pipes. The main decisive factors are the degree and type of
        
        
          damage, the sustainability of the method and the resulting rehabilitation cost. The choice of
        
        
          sustainable trenchless pipe rehabilitation techniques ranges from punctual repair over partial
        
        
          renovation to complete renewal of the defective pipeline.
        
        
          Static pipe bursting is an approved method for trenchless pipe replacement. The old
        
        
          pipe (from ND 50 on) is destroyed underground and the new pipe, often of larger diameter,
        
        
          is pulled in simultaneously. Defective supply pipes having major damages, e.g. breakage,
        
        
          incrustation, root infestation, misalignment, split sockets, tears, leakages, mechanical wear
        
        
          and tear, can be replaced. New pipes of almost any material (plastic or metal) up to ND 1000
        
        
          can be installed. Daily capacities of 150 - 300 m are possible. Applying the static pipe bursting
        
        
          method overcomes the necessity to patch repair or renovate the old pipe and a new pipeline
        
        
          with a service life of the up to 100 years in is installed perfect static conditions. In addition to
        
        
          the static pipe bursting method, the versatile GRUNDOBURST rigs can also be applied for the
        
        
          close-fit relining of pipes according to the TIP or pipe reduction method.
        
        
          
            Speedy replacement of a cast iron gas main with new PE pipes in a
          
        
        
          
            pedestrian zone
          
        
        
          The task was to renew a 100 mm (4 in.) cast iron gas main. Approximately 1500 m (4930 ft) of
        
        
          pipe in need of replacement (initial installation period between 1930 and 1960). The gas mains
        
        
          were showing signs of leakage and needed to be replaced as soon as possible. The crew were
        
        
          challenged with a section of approximately 60 m (197 ft) of this project.
        
        
          www.
        
        
          FarwestCorrosion
        
        
          .com
        
        
          
            Rectifiers
          
        
        
          
            Anodes
          
        
        
          ro
        
        
          
            Reference
          
        
        
          
            Electrodes
          
        
        
          
            Coatings
          
        
        
          
            Backfill
          
        
        
          C
        
        
          
            Test
          
        
        
          
            Instruments
          
        
        
          
            Casing Fillers
          
        
        
          or
        
        
          
            Remote
          
        
        
          
            Monitoring
          
        
        
          
            Isolators
          
        
        
          r
        
        
          
            C.P. Engineering
          
        
        
          w
        
        
          
            C.P. Installation
          
        
        
          F
        
        
          
            9 Locations
          
        
        
          
            Nationwide
          
        
        
          
            888-532-7937
          
        
        
          n
        
        
          
            The Most
          
        
        
          
            Complete
          
        
        
          
            Corrosion
          
        
        
          
            Prevention
          
        
        
          
            Site on the Web
          
        
        
          a
        
        
          
            And More...
          
        
        
          Use Your
        
        
          Smart Phone
        
        
          to Visit Our
        
        
          Website...