Extensive planning and execution included mobilisation
of marine and HDD equipment and personnel; pre-pipeline
installation work; offshore HDD site preparation; pipelay
of HDD pipe string; pre-commissioning of the HDD pipe
section; HDD product installation; burial of the pipeline;
tie-in spools; and final pre-commissioning of the entire
pipeline section.
This was an enormous accomplishment requiring
creative project planning and co-ordination among the
entire team of professionals.
Overview of project
site at entry side of
drill.
Aerial view of barge with 140 000 lb rig during drilling
operations.
View of barge from
beach at dawn.
1...,69,70,71,72,73,74,75,76,77,78 80,81,82,83,84,85,86,87,88,89,...182
Powered by FlippingBook