F
In Veneto (Italy), for SRG, S.A.L.P. is completing the final
construction activities of project Zimella – Cervignano
gas pipeline Lot 1 and facilities: 1400 mm (56 in. dia.),
75 bar and 45 678 km in length.
F
In Sicily (Italy), for SRG, S.A.L.P. has completed Phase
1 and is carrying out Phase 2 of civic, mechanical and
electro-instrumental works related to the revamping of
the Mazara del Vallo Station.
F
In Molise (Italy), for SRG, S.A.L.P. is realising the line of
Biccari – Campochiaro gas pipeline Lot 2: 1200 mm
(48 in. dia.) 75 bar and 25 764 km in length and the
construction activities of facilities
soon will start.
F
In Basilicata (Italy), S.A.L.P. is
carrying out the maintenance
and revamping of flowlines and
facilities in Val D’Agri oilfield for
Eni.
F
In southwest France, S.A.L.P.
is currently engaged in the
construction of gas pipelines and
facilities Artère de l’Adour in a
JV with DLE Spécialités for TIGF:
600 mm (24 in. dia.), 85 barg and
96.8 km in length.
F
In Kurdistan, S.A.L.P. is carrying
out flowlines for ORYX
Petroleum including flowlines
70 bar 150 (6 in. dia.) in total
length 18 km; 200 mm (8 in.
dia.) total length 8 km; 300 mm
(12 in. dia.) in total length 12 km;
and 400 mm (16 in. dia.) in total
length 1.2 km.
Flowlines 150 mm (6 in.), 200 mm (8 in.),
300 mm (12 in.) 400 mm (16 in.). ORYX
Petroleum’s EPC project provision of buried
pipelines and flowlines, Kurdistan.
Lowering-in of 600 mm (24 in. dia.) 9.7 mm w.t pipeline. TIGF’s
EPC project Artère de l’Adour, France.