contractors’
directory
2015
REHAB
WELDING
MAINTENANCE
HORIZONTAL
DIRECTIONAL
DRILLING
TURNKEY
CONSTRUCTION
88
ONSHORE
PIPELINES
RESEARCH &
DEVELOPMENT
TERMINALS
FEASIBILITY
STUDIES
FINANCE,
STRATEGY
& ANALYSIS
COMPRESSOR
STATIONS
OFFSHORE
PIPELINES
S
ICIM S.p.A. has been one of the top pipeline
contractors since 1962. Historically operating as a
contractor, mainly for Snam Rete Gas in Italy, it has
become a global player offering general services
such as project management, engineering, commissioning
and start-up for oil and gas pipelines, as well as
construction of oil, gas and water pipelines on land and
shallow water (all diameters); installation of compressor
stations, pumping stations and gas/oil separation and
processing plants; production and treatment plants; civil
works, site preparations, foundation works (industrial
buildings, environmental services).
In its 53 years in business, SICIM has installed over
10 000 km of pipelines and 24 000 t of plant piping and
structural steel.
SICIM’s headquarters in Busseto, near Parma, are the
nerve centre of a global network of offices, projects and
contracts. The company co-ordinates work at project
offices in Spain, France, Ireland, UK, Germany, Libya, Congo,
Cameroon, Angola, Mozambique, Turkey, United Arab
Emirates, Kazakhstan, Turkmenistan, Iraq, Mexico, Colombia,
Perù and Canada, as well as throughout Italy.
SICIM has recently completed the construction of:
F
Tamazunchale Gas Pipeline. 233 km, 36/30 in. dia.,
for Transportadora
de Gas Natural
de la Huasteca,
S. de R.L. de C.V.
– Mexico.
F
Chihuahua
Natural Gas
Transmission
Pipeline. 381 km,
36 in. dia., for
TARAHUMARA
PIPELINE S. de R.L.
de C.V. – Mexico.
F
Contract for construction, testing, commissioning and
start up of the ‘Oleoducto Bicentenario de Colombia’
Phase 1 Section Araguaney – Banadia. 230 km, 42 in. dia.,
for OBC – Colombia.
Some of the works in progress include:
F
Maintenance and revamping of offshore platforms in
Loango for Eni Congo SA.
F
Flowlines installation for the EPC pipelines installation,
Zubair Oil Field Project, for Eni – Iraq.
F
Mafumeira-4 – pipeline installation, mechanical and
painting works, for Petromar – Angola.
F
Sonora Pipeline Corridor. Sonora (Sasabe-Guaymas)/
Sinaloa (Guaymas-El Oro) – Mexico. 831 km,
30/36 in. dia., for Gasoducto de Aguaprieta – Mexico.
F
Various construction contracts inside Tengiz Camp for
Tengizchevroil – Kazakhstan.
F
Los Ramones Fase II Sur. Tramo I Y II. 183 km, 42 in. dia.,
for ICA FLUOR – Mexico.
F
Construction works for the turnkey EPC pipeline project
Gasoducto Sur. 454 km, 24/32 in.
dia., for Consorcio Constructor
Ductos del Sur – Perù.
F
Construction of the Trans
Anatolian Natural Gas
Pipeline (TANAP), LOT 2. 450
km, 56 in. dia., for TANAP
DO
Ğ
ALGAZ
İ
LET
İ
M A.
Ş
. –
Turkey.
F
El Encino – La Laguna Gas
Pipeline. 464.9 km, 42/20/16
in. dia., for Fermaca –
Mexico.
SICIM S.p.A
Lowering in for the Sonora Pipeline Corridor. Client:
Gasoducto de Aguaprieta, Mexico.
Construction of a section of the
Tamazunchale gas pipeline on
a rock-face with the help of a
cable crane system.
Litchendjili Onshore Treatment Facilities Project Works.
Client: Boscongo (Saipem), Congo.