World Pipelines - August 2015 - page 52

C
RC-Evans is involved in almost every aspect of
onshore and offshore pipeline construction,
helping clients around the world build better
pipelines and reduce costs.
The company’s pipeline equipment meets not only
the requirements of today, but also the future of pipeline
projects. With over 80 years of experience, CRC-Evans
has built and sold more diameter pipeline benders
than most other companies in the world. Due to this
vast experience, it has a stable financial background to
provide you the best services. CRC-Evans’ worldwide
network of offices and agents is a plus when it comes
to service. On the end, the company’s equipment has a
higher resale value than most of our competition when
your project is finished.
CRC-Evans represents the world’s largest group of
pipeline construction companies. The market leader
in each of its core businesses, CRC-Evans has offices
around the world, providing each of its customers
with the most extensive infrastructure and resources
in the industry.
As the pipeline industry faces formidable
challenges in boosting productivity, efficiency, and
profitability, CRC-Evans has always stayed at the
forefront of technological innovation. CRC-Evans
holds 129 patents and has been instrumental in
developing many of the industry’s most effective
technologies.
CRC-Evans’ engineering, design, and technical staffs
continually analyse all equipment and construction
methodology, ensuring that our approach is the most
efficient solution available.
If a pipeline can be built through it, CRC-Evans
can help you get there. The toughest conditions, the
narrowest right-of-ways, the rockiest spoils, long or short
runs, diameters of all sizes – CRC-Evans can take on any
and every challenge. From high productivity bending
systems to remote-controlled self-loading padding
contractors’
directory
2015
REHAB
FEASIBILITY
STUDIES
WELDING
MAINTENANCE
OFFSHORE
PIPELINES
48
ONSHORE
PIPELINES
RESEARCH &
DEVELOPMENT
TERMINALS
FINANCE,
STRATEGY
& ANALYSIS
COMPRESSOR
STATIONS
HORIZONTAL
DIRECTIONAL
DRILLING
TURNKEY
CONSTRUCTION
CRC-Evans
Table 1. Onshore east projects
Project
type
Project
Contractor
Location Length (km) No. of welds Dia. (in.)
Year
started
Onshore Khazzan Project
TOCO
Oman
60
3200
36
2015
Onshore
Arc de Dierrey Lot 4
(WIP)
Max Streicher GmbH France
60
3150
48
2015
Onshore RGZ-3
ENAC
Algeria
116
9250
42
2015
Onshore TANAP Lot 01
Fernas In
ş
aat a.
ş
Turkey
375
25 000
56
2015
Onshore TANAP Lot 03
Tefken
Turkey
600
40 000
56
2015
Offshore PRP3/APP/HRD
Leighton-Welspun
India
6100
6 - 18
2014
Onshore Arc de Dierrey Lot 1 Max Streicher
France
60
2500
48
2014
Onshore Arc de Dierrey Lot 3 Spiecapag - A. Hak
France
63
3160
48
2014
Onshore Krechba-Hassi R’mel
Cosinder Canalisation Algeria
231
8000
48
2014
Onshore
Los Ramones FASE II
SVR
Nuona Ghizzoni
Mexico
220
510
42
2014
Onshore
GR5 Ø 48 in. Krechba-
H’rmel IDT II
COSIDER Canalisation Algeria
201
8500
48
2014
Offshore GDF Suez
CECON
North Sea
64
4368
8 - 10
2013
Offshore BG Knarr
Subsea 7
18
1800
Misc.
2013
Onshore OB 3
Nestoil
Nigeria
600
7000
48
2013
Onshore Central Asia Phase - C CPP KZ
Kazakhstan 235
19 505
48
2013
Onshore
Kazakhstan-Gina
Pipeline
KSS
Kazakhstan 350
31 000
48
2013
Offshore Boyla
Technip
13
2051
8 - 16
2013
Offshore Moho Nord
Technip
Congo
227
18 651
6, 8, 9, 10,
16
2014
Offshore Shah Deniz
Technip
Azerbaijan
380
31 154
6 - 32
2015
Offshore South Stream
Saipem
Bulgaria
638
52 350
32
2015
Pipeline welding.
1...,42,43,44,45,46,47,48,49,50,51 53,54,55,56,57,58,59,60,61,62,...182
Powered by FlippingBook