Oilfield Technology - August 2015 - page 21

W
ith the ever increasing demands
placed upon drilling contractors,
getting the most out of the
equipment available is more important than
ever. Transport costs per tonne continue
to increase, available footprint on the rig
deck is shrinking, but requirements for
continuous and peak power rating, and
more efficient productivity, steadily rise.
To remain competitive, operators and
rig designers leverage every opportunity
available to deliver performance
DAN COOK,
WARD LEONARD,
ON GETTING THE
MOST OUT OF A RIG
BY INTEGRATING
HIGH POWER DENSITY
ELECTRIC MOTORS.
|
19
1...,11,12,13,14,15,16,17,18,19,20 22,23,24,25,26,27,28,29,30,31,...76
Powered by FlippingBook